Swanson Medical Centre
Auckland Architects | Commercial Architecture | School Architects | DLM Architects | De La Mare Architects | Education Architecture | Residential Architecture | Interior Design | Planning | Landscape Designer | garden Design | Dave De La Mare | Steve Clapham | Genevieve Koh | Lucy Mills | Dasha Tapa | Tatiana Zimina | |Claire Powell |Isabella Seakins
Auckland Architects | Commercial Architecture | School Architects | DLM Architects | De La Mare Architects | Education Architecture | Residential Architecture | Interior Design | Planning | Landscape Designer | garden Design | Dave De La Mare | Steve Clapham | Genevieve Koh | Lucy Mills | Dasha Tapa | Tatiana Zimina | |Claire Powell |Isabella Seakins
Auckland Architects | Commercial Architecture | School Architects | DLM Architects | De La Mare Architects | Education Architecture | Residential Architecture | Interior Design | Planning | Landscape Designer | garden Design | Dave De La Mare | Steve Clapham | Genevieve Koh | Lucy Mills | Dasha Tapa | Tatiana Zimina | |Claire Powell |Isabella Seakins
Auckland Architects | Commercial Architecture | School Architects | DLM Architects | De La Mare Architects | Education Architecture | Residential Architecture | Interior Design | Planning | Landscape Designer | garden Design | Dave De La Mare | Steve Clapham | Genevieve Koh | Lucy Mills | Dasha Tapa | Tatiana Zimina | |Claire Powell |Isabella Seakins
Swanson Medical Centre
DLM Architects were asked to provide a design solution for an expanding practice at the Swanson Medical Centre. The practice had operated from the same site for 25 years and was under pressure to deliver increased service. DLM were briefed to provide office space for four doctors, nurse consulting rooms associated specialist treatment rooms along with administration and staff spaces.
The building is a 1940s bungalow, which had to be doubled in size to provide space for the new service’s. The construction presented the challenge of altering the building whilst the practice continued to operate. This was achieved through a 2 stage program and was successfully managed by all the parties involved.